Pittsburgh Traffic

Click to Interact
Type
Location
Description
Time
construction
I-376 EEastbound
Exit ramp from I-376 Eastbound to Forbes Ave Eastbound closed due to construction work.
construction
Forbes AveEastbound
Entry ramp to Forbes Ave Eastbound from Boulevard of the Allies Eastbound closed due to construction work.
incident
PA-43-TPKESouthbound
Left lane blocked due to crash on PA-43-TPKE Southbound after Exit 2 PA-43.
construction
I-376 Exit 72AEastbound
Exit ramp from I-376 Exit 72A Eastbound to Forbes Ave Eastbound closed due to construction.
incident
I-79Northbound
Lane closed and slow moving maintenance vehicles on I-79 Northbound between Exit 65 Grand Ave and I-279.
construction
PA-885Southbound
Lane closed due to construction on PA-885 Boulevard of the Allies Southbound between Jumonville St and I-376.
incident
I-79Southbound
Lane closed and slow moving maintenance vehicles on I-79 Southbound between I-79 S and Exit 65 Grand Ave.
incident
I-279Northbound
Lane closed and slow moving maintenance vehicles on I-279 Northbound between Exit 1B-C PA-65 and Exit 8 Camp Horne Rd.
construction
US-19-TRUCKSouthbound
Lane closed due to construction on US-19-TRUCK Mcknight Rd Southbound between Babcock Blvd and I-279.
construction
PA-910both ways
Lane closed due to construction on PA-910 Gibsonia Rd both ways between Pearce Mill Rd and Hardt Rd.
construction
US-19-TRUCKSouthbound
Lane closed due to construction on US-19-TRUCK Saw Mill Run Blvd Southbound between PA-51 and US-19-TRUCK Saw Mill Run Blvd.
construction
Rochester RdEastbound
Lane closed due to construction on Rochester Rd Eastbound between Powell Rd and Woodhollow Dr.
construction
16th St Brgboth ways
Bridge closed due to filming on 16th St Brg both ways between Chestnut St and Penn Ave.
construction
PA-51both ways
Lane closed due to construction on PA-51 Mcgovern Blvd both ways between Purdy Rd and Spring Run Rd.
construction
US-22-BREastbound
Lane closed due to utility work on US-22-BR William Penn Hwy Eastbound between PA-791 and Merrie Woode Dr.
construction
Main Stboth ways
Lane closed due to utility work on Main St both ways between 6th St and 8th St.
construction
Valley Driveboth ways
Closed to high sided vehicles due to new road layout on Valley Drive both ways in Mollenauer.
construction
US-322both ways
Lane closed due to construction on US-322 Main St both ways between Fuller Rd and US-322 Main St.
construction
PA-281Westbound
Lane closed due to construction on PA-281 Main St Westbound between Parson Ave and Vincent Ave.
construction
PA-51Northbound
Lane closed due to utility work on PA-51 Coraopolis Rd Northbound between Herbst Rd and Forest Grove Rd.

Latest Trending