PITTSBURGH — Pittsburgh city officials announced the next round of streets being resurfaced.
The city kicked off the 2026 paving season in early April and plans to repave over 24 miles of streets throughout the year.
The streets expected to have milling or paving work done between May 18-22 are listed below, though work could be postponed due to weather or other factors.
Streets being milled:
- Elwell Street from Mere Street to Ollie Street
- Oakleaf Drive from Leaside Drive to the dead end
- Mooney Road from Oakville Street to Lindberg Avenue
- Hillburn Street from Wheeling Street to Mifflin Road
- Baldwin Road from Ramp Street to Glass Run Road
- Kelso Way from Ashton Avenue to Mansion Street
- Dolphin Way from Glenwood Avenue to Osprey Way
- Flowers Avenue from Glenwood Avenue to Kilbourne Street
- Hilltop Street from Parnell Street to Parade Street
- Loretta Street from Millington Road to Tesla Street
- Loretta Street from Greenfield Avenue to Murray Avenue
- Sunapee Way from Shady Avenue to the dead end
- Beechwood Bouelvard from Douglas Street to Phillips Avenue
- Kentucky Avenue from House Number 5705 to 5735
- Tay Way from Pierce Street to behind House Number 5832
- South Braddock Avenue at Biddle Avenue
Streets being paved:
- Urn Way from Walnut Street to Elmer Street
- Elmer Street from Summerlea Street to Filbert Street
- Filbert Street from Tara Way to Ellsworth Avenue
- Ivy Street from Walnut Street to Ellsworth Avenue
- Elwell Street from Mere Street to Ollie Street
- Oakleaf Drive from Leaside Drive to the dead end
- Mooney Road from Oakville Street to Lindberg Avenue
- Hillburn Street from Wheeling Street to Mifflin Road
- Baldwin Road from Ramp Street to Glass Run Road
The resurfacing project supports asphalt street resurfacing, ADA curb ramp upgrades and repair of concrete, brick and block stone streets throughout Pittsburgh.
Download the FREE WPXI News app for breaking news alerts.
Follow Channel 11 News on Facebook and Twitter. | Watch WPXI NOW